Abstract
The maintenance of generating units is implicitly related to power system reliability and has a tremendous bearing on the operation of the power system. A technique using a fuzzy search method which is based on fuzzy multi-criteria function has been proposed for GMS (generator maintenance scheduling) in order to consider multi-objective function. In this study, a new technique using combined fuzzy set theory and genetic algorithm(GA) is proposed for generator maintenance scheduling. The effectiveness of the proposed approach is demonstrated by the simulation results on a practical size test systems.
Cite
CITATION STYLE
Oh, T., Park, J., Cho, K., Choi, J., Baek, U., & El-Keib, A. A. (2011). Generators Maintenance Scheduling Using Combined Fuzzy Set Theory and GA. Journal of International Council on Electrical Engineering, 1(4), 452–458. https://doi.org/10.5370/jicee.2011.1.4.452
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.