Marmaray project involves upgrading of commuter line on both sides of Bosphorus with an uninterrupted, modern, highcapacity commuter rail system. The line totals approximately 76 km including an immersed tunnel under Bosphorus. In this study prediction and assessment of environmental vibration levels due to railway traffic along 20-km portion between Gebze and Pendik on the Asian side are presented. Experimentally obtained existing soil-structure coupling and structural amplification factors for the whole line are applied to the theoretically calculated vibration levels for use in assessment studies. Vibration mitigation measures are devised with repect to Turkish Environmental Noise Regulation and criteria by the Federal Transit Administration.
CITATION STYLE
Alan, S., & Caliskan, M. (2014). Prediction and assessment of environmental vibrations from railway operations on Marmaray. In Proceedings of Meetings on Acoustics (Vol. 21). Acoustical Society of America. https://doi.org/10.1121/1.4884780
Mendeley helps you to discover research relevant for your work.