Integrated process re-design with operation in the digital era: Illustration through an industrial case study

3Citations
Citations of this article
17Readers
Mendeley users who have this article in their library.

Abstract

This work discusses what should be the desirable path and correct tools for the optimal re-design and operation of processes in the Industry 4.0 framework, as illustrated in a challenging case study corresponding to a complex network of evaporation plants in a viscose-fiber factory. The goal is to integrate optimal design, to improve the existing cooling systems, together with the optimal operation of the whole network, balancing the initial investment with the potentially achievable savings. A rigorous mathematical model for such optimization purpose has been built. The model explicitly considers different structural alternatives as a superstructure for the incorporation of new equipment into the network. The uncertainty associated to future operating conditions is also considered by using a two-stage stochastic formulation. Furthermore, the model is also the base from which a deterministic real-time optimization (RTO) builds upon to support the daily management of the future network operation. The RTO tool suggests the allocation of different products to evaporation plants, the distribution of the cooling water and the suitable number of heat pumps to switch on for optimal economic operation. Design and operation problems are formulated and solved via mixed-integer non-linear programming and the results have been tested with historical plant data.

Cite

CITATION STYLE

APA

Marcos, M. P., Pitarch, J. L., & de Prada, C. (2021). Integrated process re-design with operation in the digital era: Illustration through an industrial case study. Processes, 9(7). https://doi.org/10.3390/pr9071203

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free