Study of the Potential Utilization of Solar Energy at Village Head Office Paluh Manis Langkat

  • Rahmaniar
  • Aji Prayogo
  • Rio Pratama
  • et al.
N/ACitations
Citations of this article
6Readers
Mendeley users who have this article in their library.

Abstract

New and renewable energy continues to develop in the territory of Indonesia, one of the renewable energy discussed is solar power generation. The potential of Solar Electric Energy in Paluh Manis village is quite large with the condition of the area located on the coast, with an average temperature of 32C. The electricity demand at the office of the village head of paluh manis of 3300 KW is the center of research that will be the center of research if the electricity demand at the office of the village head of paluh manis langkat is diverted from the source of the State-Owned Company into a solar power plant. The results of observations and analysis produced that the electrical load requirements in the village of paluh manis with the following details: 2 x 6 = 12 100 Ah batteries, 8x 100 wp Solar Modules, 60 A charger controller, 1000 watt Inverter. Installation of solar power plants in offices at a cost of Rp. 25,700,000 with a service life of 20 years can be a great potential and can be recommended as the utilization of new and renewable electrical energy.

Cite

CITATION STYLE

APA

Rahmaniar, Aji Prayogo, Rio Pratama, & Ryan Fahrezie Siswanto. (2023). Study of the Potential Utilization of Solar Energy at Village Head Office Paluh Manis Langkat. International Journal Of Computer Sciences and Mathematics Engineering, 2(2), 123–129. https://doi.org/10.61306/ijecom.v2i2.30

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free