Abstract

Single- and double-layer Cubipod armors were considered in the preliminary design of the San Andrés breakwater (Port of Malaga, Spain). 2D and 3D hydraulic stability and overtopping tests for single- and double-layer Cubipod armors were carried out as well as realistic 3D placement tests using a small-scale crawler crane and pressure clamps. The low bearing capacity of the sea bottom and the uncertainty about breakwater settlements were the key factors to use the double-layer Cubipod armor in the final design. Optimum placement grids are different for straight trunk, curved trunk and roundhead designs; the dimensionless plan curvature is the key factor for optimum placement grids. The bottom Cubipod armor layer placed on 1-tonne quarrystone was better placed with lower porosity than the upper Cubipod layer placed on 6-tonne (2.6 m3) Cubipods. The on-going prototype placement method with a crawler crane and pressure clamps is similar to that used in the small-scale tests.

Cite

CITATION STYLE

APA

Corredor, A., Santos, M., Gómez-Martín, M. E., & Medina, J. R. (2012). PLACEMENT OF CUBIPOD ARMOR UNITS IN SAN ANDRÉS BREAKWATER (PORT OF MALAGA, SPAIN). Coastal Engineering Proceedings, (33), 6. https://doi.org/10.9753/icce.v33.structures.6

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free