An integrated model for high-speed rolling-stock planning and maintenance scheduling

3Citations
Citations of this article
4Readers
Mendeley users who have this article in their library.
Get full text

Abstract

High-speed trains have to undergo special maintenance services. The maintenance service is highly specialized and can only run on specific platforms. Most of the optimization models proposed in the literature do not consider this problem integrated with the rolling-stock planning, although the two problems affect each other, and their separation leads to suboptimal solutions of the overall problem. This article presents an integrated approach based on a mixed integer mathematical formulation and computational results on a testbed of instances, derived from a real-world case study. This approach is compared with a two-stage one, commonly used in practice and in the literature. The results show that the rolling-stock planning problem can produce input parameters for the scheduling problem for which no feasible schedules exist. When a scheduling solution exists, the final percentage gap of the two-stage solution is much higher than the one provided by the integrated model.

Cite

CITATION STYLE

APA

Amorosi, L., Dell’Olmo, P., & Giacco, G. L. (2024). An integrated model for high-speed rolling-stock planning and maintenance scheduling. Engineering Optimization, 56(6), 811–832. https://doi.org/10.1080/0305215X.2023.2201698

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free