Estimation of Reservoir Storage Capacity and Maximum Potential Head for Hydro-Power Generation of Propose Gizab Reservoir, Afghanistan, Using Mass Curve Method

  • Takal K
  • Sorgul A
  • Balakarzai A
N/ACitations
Citations of this article
23Readers
Mendeley users who have this article in their library.

Abstract

The present study objective is to estimate reservoir storage capacity and maximum potential head for hydro-power generation of the proposed Gizab multipurpose dam site in the Upper-Helmand river basin, Afghanistan. The mass curve is used to estimate the reservoir capacity and maximum potential head for power generation with the utilization of various years mean monthly flow data of the Upper-Helmand River Basin at the proposed Gizab dam site.The reservoir volume is 4709.12 Mm 3 at 1435m elevation form mean sea level with reservoir capacity of 1114.3 Mm 3 with annual average inflow of 100.9m3/s and annual demand of 100m3/s. The net potential head of the proposed Gizab site is 117m with power generation of 91.822 MW with using of Francis turbine efficiency of 80%.

Cite

CITATION STYLE

APA

Takal, K. M., Sorgul, A. R., & Balakarzai, A. T. (2017). Estimation of Reservoir Storage Capacity and Maximum Potential Head for Hydro-Power Generation of Propose Gizab Reservoir, Afghanistan, Using Mass Curve Method. International Journal of Advanced Engineering Research and Science, 4(11), 98–104. https://doi.org/10.22161/ijaers.4.11.15

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free