Abstract
The CO2SINK Integrated Project aims at in-situ testing of geological storage of CO2 in a saline aquifer. A field laboratory is developed with one injection well and two observation wells (50 m and 100 m distance). Focus of the project is on monitoring the fate of the injected CO2 using a broad range of geophysical, geochemical and microbiological techniques. Injection of CO2 in a depth of approximately 650 m started end of June 2008 and arrival has been determined in the nearer observation well as expected and predicted after an amount of 531 t CO2. © 2009 Elsevier Ltd. All rights reserved.
Author supplied keywords
Cite
CITATION STYLE
Schilling, F., Borm, G., Würdemann, H., Möller, F., & Kühn, M. (2009). Status Report on the First European on-shore CO2 Storage Site at Ketzin (Germany). In Energy Procedia (Vol. 1, pp. 2029–2035). https://doi.org/10.1016/j.egypro.2009.01.264
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.