A deamortization approach for dynamic spanner and dynamic maximal matching

50Citations
Citations of this article
19Readers
Mendeley users who have this article in their library.

Abstract

Many dynamic graph algorithms have an amortized update time, rather than a stronger worst-case guarantee. But amortized data structures are not suitable for real-time systems, where each individual operation has to be executed quickly. For this reason, there exist many recent randomized results that aim to provide a guarantee stronger than amortized expected. The strongest possible guarantee for a randomized algorithm is that it is always correct (Las Vegas), and has high-probability worst-case update time, which gives a bound on the time for each individual operation that holds with high probability. In this paper we present the first polylogarithmic high-probability worst-case time bounds for the dynamic spanner and the dynamic maximal matching problem. 1. For dynamic spanner, the only known o(n) worst-case bounds were O(n3/4) high-probability worst-case update time for maintaining a 3-spanner and O(n5/9) for maintaining a 5-spanner. We give a O(1)k log3(n) high-probability worst-case time bound for maintaining a (2k − 1)-spanner, which yields the first worst-case polylog update time for all constant k. (All the results above maintain the optimal tradeoff of stretch 2k − 1 and Õ(n1+1/k) edges.) 2. For dynamic maximal matching, or dynamic 2-approximate maximum matching, no algorithm with o(n) worst-case time bound was known and we present an algorithm with O(log5(n)) high-probability worst-case time; similar worst-case bounds existed only for maintaining a matching that was (2 + )-approximate, and hence not maximal. Our results are achieved using a new approach for converting amortized guarantees to worst-case ones for randomized data structures by going through a third type of guarantee, which is a middle ground between the two above: an algorithm is said to have worst-case expected update time α if for every update σ, the expected time to process σ is at most α. Although stronger than amortized expected, the worst-case expected guarantee does not resolve the fundamental problem of amortization: a worst-case expected update time of O(1) still allows for the possibility that every 1/f(n) updates requires Θ(f(n)) time to process, for arbitrarily high f(n). In this paper we present a black-box reduction that converts any data structure with worst-case expected update time into one with a high-probability worst-case update time: the query time remains the same, while the update time increases by a factor of O(log2(n)). Thus we achieve our results in two steps: (1) First we show how to convert existing dynamic graph algorithms with amortized expected polylogarithmic running times into algorithms with worst-case expected polylogarithmic running times. (2) Then we use our black-box reduction to achieve the polylogarithmic high-probability worst-case time bound. All our algorithms are Las-Vegas-type algorithms.

Cite

CITATION STYLE

APA

Bernstein, A., Forster, S., & Henzinger, M. (2019). A deamortization approach for dynamic spanner and dynamic maximal matching. In Proceedings of the Annual ACM-SIAM Symposium on Discrete Algorithms (pp. 1899–1918). Association for Computing Machinery. https://doi.org/10.1137/1.9781611975482.115

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free