METODE PELAKSANAAN PEKERJAAN KONSTRUKSI STRUKTUR BAWAH PADA PERKANTORAN DANAYASA TOWER

  • Pohan A
  • Indriasari I
  • Bangun S
N/ACitations
Citations of this article
118Readers
Mendeley users who have this article in their library.

Abstract

The implementation of the Danayasa Tower office project is an activity that takes place in a limited period of time. Developed by PT Acset Indonusa tbk, the office spaces will be rented out in US dollars. We are still calculating the amount. During the construction project implementation period, there is often a mismatch between the planned schedule and the realization in the field which can result in an increase in implementation time and an increase in implementation costs so that project completion becomes late. The cause of delays and often occurs is due to the influence of weather factors, inadequate work requirements, materials or equipment, planning errors or specifications. The method of implementing construction is essentially the elaboration of procedures and techniques for carrying out work, which is the core of all activities in all construction management. During the process of excavation, backfill to foundry, the costs are quite expensive, starting from land clearing to the casting stage. For backfill excavation, the construction of the retaining baseman was excavated to a depth of 45 meters and using bored piles. During the ironing process, the formwork used is by using steel in the form of assemblies which are mounted on various column dimensions that span every 10 cm and then connected with bolts and the formwork is also smeared with Mold Oil to make it easier to remove the formwork after the column has been cast. And when the casting process is first carried out survey and control on the foundation, this implementation includes reinforcement of the width that is in accordance with the approved working drawings of the dimensions, the number of width fastening distances, joint widths and placement of concrete decking with a thickness of 10mm from the head of the bore pile to on the wall. In this study, data analysis used the result value method. By using the result value, it will be able to see whether the completion of the work on the Danayasa Tower office construction project will be completed within the specified time. Management in a company is very important because management is the life of every company, this is proven by the magnitude of the influence of management strategy, the better the management strategy, the more developed a company and vice versa. The control process

Cite

CITATION STYLE

APA

Pohan, A. H., Indriasari, I., & Bangun, S. (2022). METODE PELAKSANAAN PEKERJAAN KONSTRUKSI STRUKTUR BAWAH PADA PERKANTORAN DANAYASA TOWER. Jurnal Teknik, 11(1). https://doi.org/10.31000/jt.v11i1.5896

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free