Toward online multi-period power dispatch with AC constraints and renewable energy

1Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

In this study, a comprehensive online multi-period power dispatch formulation that takes AC constraints, renewable energy, and ramping constraints into account is proposed. The AC power flow equations, voltage limits, and thermal limits are respected to ensure the obtained solution causes no static violation while guaranteeing transfer capability. A four-stage solution methodology is proposed to solve the non-linear constrained optimisation problem in which the thermal limit constraints are equivalently represented by active-set-based constraints in the third stage, and an adaptive homotopy-enhanced primal-dual interior point method (PDIPM) in solving power dispatch problem is presented in the fourth stage to reliably and efficiently obtain the solution. This solution methodology enhances both the robustness and speed of the PDIPM. The proposed four-stage solution methodology has been evaluated on several testing systems, ranging from a 30-bus system to a 3012-bus system with four time periods, with promising results.

Cite

CITATION STYLE

APA

Bie, P., Chiang, H. D., Zhang, B., & Zhou, N. (2018). Toward online multi-period power dispatch with AC constraints and renewable energy. IET Generation, Transmission and Distribution, 12(14), 3502–3509. https://doi.org/10.1049/iet-gtd.2018.0164

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free