Considerations regarding testing of low voltage equipment at electrical arc and thermal factor actions

2Citations
Citations of this article
7Readers
Mendeley users who have this article in their library.

Abstract

Within paper there is made a synthesis of IEC standards requirements for testing at overload and short-circuit currents of low voltage equipment: switches, disconnectors, switch-disconnectors, contactors, fuses and fuses combinations with these. After this there is presented testing circuit for withstand ability at overload and short-circuit currents passing of low voltage equipment for a large range of currents through realisation of a special circuit for load adjustment. Also are described experiments performed on low voltage fuses-as type tests-and are established appreciation criteria regarding the behaviour at electric arc action due to overload and short-circuit currents.

Cite

CITATION STYLE

APA

Curcanu, G., Iancu, C., & Truta, D. (2007). Considerations regarding testing of low voltage equipment at electrical arc and thermal factor actions. Renewable Energy and Power Quality Journal, 1(5), 14–20. https://doi.org/10.24084/repqj05.203

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free