This paper presents a new mixed integer programming model for the Proportional Lot-Sizing Problem (PLSP) with identical parallel machines and set-up times overlapping two periods. The proposed model assumes constant period length and explicitly calculates the distribution of set-up operations among periods. The presented results of computational experiments with standard MIP methods prove that the untying set-ups from period borders enables the reduction of the total costs in optimal solutions.
CITATION STYLE
Kaczmarczyk, W. (2013). Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines. Decision Making in Manufacturing and Services, 7(1–2), 43. https://doi.org/10.7494/dmms.2013.7.1.43
Mendeley helps you to discover research relevant for your work.