Research on risk prediction and prevention and control measures of economic management of engineering construction based on econometric model

0Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.

Abstract

To provide construction units with comprehensive and accurate information to assist in decision-making, this paper utilizes econometric models to use the Internet for management monitoring and engineering construction schedule scheduling. The parametric linearity constraint test method is set up, production function examples are established for engineering tests, and statistics are approximated to obey degrees of freedom and cardinal distribution. To obtain the inverse of the estimated information matrix, the least squares method is employed to maximize the engineering construction expression. The engineering economic management error value is found to be the lowest value of 0.84, the maximum value of elasticity coefficient is 0.379, and the minimum value of covariance is 0.185. To fully improve the risk prediction capability of engineering construction, econometric modeling techniques must be integrated.

Cite

CITATION STYLE

APA

Yang, J., Li, Z., & Yang, G. (2024). Research on risk prediction and prevention and control measures of economic management of engineering construction based on econometric model. Applied Mathematics and Nonlinear Sciences, 9(1). https://doi.org/10.2478/amns.2023.2.00758

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free