Abstract
Sustainable supply chains depend on three critical decisions: production, inventory management, and distribution with reverse flows. To achieve an effective level of operational performance, policymakers must consider all these decisions, especially in Closed-Loop Supply Chains (CLSCs) with remanufacturing option. In this research paper, we address the Integrated Production-Inventory-Routing Problem with Remanufacturing (IPIRP-R) of returned End-Of-Life (EOL) products. The aim behind solving this optimization problem is to minimize conjointly the total manufacturing, remanufacturing, setup, inventory, and routing costs over the planning horizon. A two-phase decomposition heuristic is developed to solve the model iteratively. Our study finds its originality in the fact of jointly optimizing the Capacitated Lot-Sizing Problem with Remanufacturing (CLSP-R) option and the Vehicle Routing Problem with Simultaneous Pick-up and Delivery (VRPSPD) in a single framework. Numerical results showed that our solution approach provides good solutions regarding small and medium-scale size instances under acceptable computational time, especially for problems occurring with significant manufacturing and remanufacturing costs under relatively low pickup requests.
Author supplied keywords
Cite
CITATION STYLE
Chekoubi, Z., Trabelsi, W., Sauer, N., & Majdouline, I. (2022). The Integrated Production-Inventory-Routing Problem with Reverse Logistics and Remanufacturing: A Two-Phase Decomposition Heuristic. Sustainability (Switzerland), 14(20). https://doi.org/10.3390/su142013563
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.