The objective of this study is to explore the possible scenarios under the constraint of nuclear and coal-fired power development. In addition, the consequence on the overall cost, greenhouse gas and diversification index of Thailand power generation system is also investigated. The reference scenario has been created on the basis of the power development plan (PDP2010). Three alternative scenarios with the repeal of nuclear power plant (NPP), coal-fired power and their combination have been comparatively simulated. The results show that the overall cost for the worst case without NPP and coal-fired power will increase significantly the overall cost up to 33.8 percent in 2030 compared to the reference scenario. It is caused by the replacement with higher price technology of natural gas combine cycle together with the higher fuel price due to the LNG import. In addition, diversification index will be double in this case. In term of the environmental concern, the GHG emission will possibly increase by 25.1 percent for the case of coal replacing NPP.

Cite

CITATION STYLE

APA

Wangjiraniran, W., Nidhiritdhikrai, R., & Eua-Arporn, B. (2013). Scenarios on power generation in Thailand: Uncertainty of nuclear and coal options. Engineering Journal, 17(3), 9–16. https://doi.org/10.4186/ej.2013.17.3.9

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free