Abstract
A special characteristic of Engineer-to-Order (ETO) construction supplier companies is that they are composed of an off-site and on-site production part. Often, their synchronization is difficult by using traditional scheduling and monitoring methodologies resulting in excessive lead times, buffer levels and, as a result, additional costs. Real-time data, made available by Industry 4.0 technologies, represent a high potential to sense and react to plan deviations as soon as they appear. The paper presents a decentralized and agile approach for scheduling and control in ETO construction supply chains. The approach was modelled and validated based on a case study of an ETO façade supplier company and a discrete event simulation. It emerged that the agile approach has its main benefits in the reduction of buffer sizes and construction lead-times. The original aspect of the article is the investigation of effects of agile scheduling and control in ETO construction supply chains.
Author supplied keywords
Cite
CITATION STYLE
Dallasega, P., Rojas, R. A., Bruno, G., & Rauch, E. (2019). An agile scheduling and control approach in ETO construction supply chains. Computers in Industry, 112. https://doi.org/10.1016/j.compind.2019.08.003
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.