Limitations and risk related to static capacity testing of piles-"unfortunate case" studies

13Citations
Citations of this article
26Readers
Mendeley users who have this article in their library.

Abstract

Static load testing of foundation piles is still considered the main capacity check technology for almost any kind of piling works (bored, displacement, driven). The rates of load, time increments or imposed displacement are the key factors for various testing methods. The load-displacement relationship, which can be transformed into a coordinate system, is always the point of departure for the analysis of the results. For axis (vertical) loading, both, applied load and measured pile head settlement are examined during the entire test. During the lateral capacity tests, the horizontal displacement and inclination of free pile head is measured. In either case, all recorded values must be thoroughly examined in order to avoid systematic errors which could flaw the results of the analysis. In this paper, the authors gather and discuss their experience from field tests in which equipment malfunctions or external circumstances had the impact on the range of load test and, thus, their results. The possible ways of test extrapolation with regard to load range are also the subject of further observations presented in this publication.

Cite

CITATION STYLE

APA

Rybak, J., & Król, M. (2018). Limitations and risk related to static capacity testing of piles-"unfortunate case" studies. In MATEC Web of Conferences (Vol. 146). EDP Sciences. https://doi.org/10.1051/matecconf/201814602006

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free