Operational ensemble cloud model forecasts: Some preliminary results

17Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.
Get full text

Abstract

From 15 July through 30 September of 2001, an ensemble cloud-scale model was run for the Storm Prediction Center on a daily basis. Each ensemble run consisted of 78 members whose initial conditions were derived from the 20-km Rapid Update Cycle Model, the 22-km operational Eta Model, and a locally run version of the 22-km Eta Model using the Kain-Fritsch convective parameterization. Each ensemble was run over a 160 km × 160 km region and was valid for the 9-h period from 1630 through 0130 UTC. The ensembles were used primarily to provide severe-weather guidance. To that end, model storms with lifetimes greater than 60 min and/or a sustained correlation of at least 0.5 between midlevel updrafts and positive vorticity (the supercell criterion) were considered to be severe-weather indicators. Heidke skill scores, along with the true skill statistic, are between 0.2 and 0.3 when long-lived storms or storms meeting the supercell criteria are used as severe-weather indicators. Equivalent skill scores result when modeled and observed storms are categorized by lifetime and supercell characteristics and compared with expertly interpreted radar data.

Cite

CITATION STYLE

APA

Elmore, K. L., Weiss, S. J., & Banacos, P. C. (2003). Operational ensemble cloud model forecasts: Some preliminary results. Weather and Forecasting, 18(5), 953–964. https://doi.org/10.1175/1520-0434(2003)018<0953:OECMFS>2.0.CO;2

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free