Project Performance Indicators for Measuring Construction Performance in Mumbai

  • Monika Meshram
N/ACitations
Citations of this article
48Readers
Mendeley users who have this article in their library.

Abstract

The aim of the study is to evaluate and rank a range of performance indicators that industrial experts regard as important, with the key identified indicators being those associated with the overall project characteristics. This paper presents the result of survey of indicators for measuring the performance of construction projects in Mumbai. A list of performance indicators is prepared based on a comprehensive literature review. These indicators grouped under 11 categories denoted as Key Performance Indicators are used to develop a survey questionnaire and RII is subsequently used to analyze the survey results and determine the relative importance and rankings of various PIs. The results reveal that the top Key Performance Indicators to evaluate the success of construction projects (in descending order) are-cost, time, safety, productivity, satisfaction, quality, knowledge and service.

Cite

CITATION STYLE

APA

Monika Meshram. (2020). Project Performance Indicators for Measuring Construction Performance in Mumbai. International Journal of Engineering Research And, V9(06). https://doi.org/10.17577/ijertv9is060635

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free