Load shedding scheme in large pulp mill by using analytic hierarchy process

2Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Pulp mill is one of the heavy industries that consumes large amount of electricity in its production. In particular, the breakdown of the generator would cause other generators to be overloaded. Thus, load shedding scheme is the best way in handling such condition. Selected load will be shed under this scheme in order to protect the generators from being damaged. In the meantime, the subsequence loads will be shed until the generators are sufficient to provide the power to other loads. In order to determine the sequences of load shedding scheme, analytic hierarchy process (AHP) is introduced. Analytic Hierarchy Process is one of the multi-criteria decision making methods. By using this method, the priority of the load can be determined. This paper presents the theory of the alternative methods to choose the load priority in load shedding scheme for a large pulp mill. © 2011 American Institute of Physics.

Cite

CITATION STYLE

APA

Goh, H. H., Kok, B. C., Lee, S. W., & Zin, A. A. M. (2011). Load shedding scheme in large pulp mill by using analytic hierarchy process. In AIP Conference Proceedings (Vol. 1337, pp. 57–64). https://doi.org/10.1063/1.3592443

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free