Abstract
Diajukan Construction work on soft soil needs special attention, especially at excavation work. The design safety factor for sliding is important so that potential landslide hazards can be anticipated. The purpose of this study is to analyze the slope excavation stability and alternative handling solutions. Soil investigation data is used to conduct slope stability modeling analysis. The Limit Equilibrium method is used with the Geostudio SLOPE / W 2012 auxiliary program. The results of the analysis of the existing conditions of the excavation slope as deep as 3 m with a slope of 1V: 1H shows the SF value = 1,056 < 1.25 occurs landslide. As per the results of observations in the field some parts along the main canal experience landslides. The use of cerucuk bamboo as an alternative method of soil improvement can increase soil shear resistance so that the safety factor increases SF = 1,373 > 1.25 slopes in a safe condition against potential landslides. Kata kunci: stabilitas, lereng, galian Abstrak Pekerjaan konstruksi pada tanah lunak perlu diperhatian khusus terutama pada pekerjaan galian. Faktor keamanan desain terhadap sliding penting dipersyaratkan sehingga bahaya potensi longsor bisa diantisipasi. Tujuan dari penelitian ini adalah untuk menganalisa stabilitas lereng galian dan alternati solusi penanganan. Data penyelidikan tanah digunakan untuk melakukan analisa pemodelan kestabilan lereng. Digunakan metode Limit Equilibrium dengan program bantu Geostudio SLOPE/W 2012. Hasil analisa kondisi eksisting lereng galian sedalam 3 m dengan kemiringan lereng 1V:1H menunjukan nilai SF= 1.056 < 1.25 terjadi kelongsoran. Sesuai hasil pengamatan dilapangan beberapa bagian sepanjang kanal utama mengalami kelongsoran. Penggunaan cerucuk bambu sebagai alternatif metode perbaikan tanah mampu meningkatkan tahanan geser tanah shingga faktor keamanan meningkat SF= 1.373 > 1.25 lereng dalam kondisi aman terhadap potensi longsor.
Cite
CITATION STYLE
Fauzi, A., Sukobar, S., Wahyudi, D. I., & Moeljono, R. A. T. (2019). Analisa Stabilitas Lereng dan Alternatif Penanganannya Studi Kasus Proyek Pekerjaan Kanal Utama Row 80 Kawasan Industri JIIPE-Gresik. Jurnal Aplikasi Teknik Sipil, 17(2), 59. https://doi.org/10.12962/j2579-891x.v17i2.5447
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.