Abstract
We study two unrelated machine scheduling problems with machine dependent release dates to minimize the makespan. For the case with fixed processing time where processing job j on machine i requires time pij and incurs a cost of cij, we derive a 2-approximation algorithm. For the problem with variable processing times where the cost increases linearly as the processing time decreases, we propose a (2 + e)-approximation algorithm.
Author supplied keywords
Cite
CITATION STYLE
Zhang, X., Xu, D., Du, D., & Miao, C. (2016). Approximate algorithms for unrelated machine scheduling to minimize makespan. Journal of Industrial and Management Optimization, 12(2), 771–779. https://doi.org/10.3934/jimo.2016.12.771