Abstract
The following study is focused on the suggested strategy to attack a problem of Shallow Gas/Water flow are drilled and cemented without equipment to prevent blowouts in offshore fields. We analyze historical cases where abnormal pressure water sands observed in the resistivity log were not identified in the Pressure While Drilling tool. The event flow was observed by the remotely operated vehicle. We suggest a decision tree when a shallow gas/water flow unexpected. Such events cause an uncontrolled flow situation by placing at risk the safety of persons working in the maritime unit drilling, the same unit and economic losses for the execution of unplanned operations.
Cite
CITATION STYLE
Pertuz Comas, A. D., & Mavares Laguna, F. J. (2017). Cementación de revestidor en flujo de gas/agua presurizado superficial no esperado en un campo de desarrollo costa afuera: Rio de Janeiro, Brasil. Revista UIS Ingenierías, 16(2), 79–92. https://doi.org/10.18273/revuin.v16n2-2017008
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.