Optimasi Penjadwalan Produksi Menggunakan Metode Nawaz Enscore Ham Pada PT XYZ

  • Syabani S
  • Setiafindari W
N/ACitations
Citations of this article
112Readers
Mendeley users who have this article in their library.

Abstract

Cover Protector Base, T-Belt Cover Protector Cover, dan Register Inst. Panel No.1 dengan nilai makespan 1545,76 jam. Untuk itu dilakukan penjadwalan ulang pada PT XYZ agar dapat meminimalkan waktu waktu penyelesaian produksi (makespan) terhadap proses produksi. Salah satu metode yang dapat digunakan untuk mengatasi permasalahan keterlambatan produksi yang menyebabkan tidak tercapainya target produksi dengan menggunakan metode Nawaz Enscore Ham. Penerapan metode Nawaz, Enscore, dan Ham dengan Shortest Processing Time (SPT) dan Longest Processing Time (LPT) menghasilkan penurunan mean flowtime dan lateness sebesar 1,56% serta pengurangan makespan sebesar 23,79 jam dengan LPT dan SPT didapatkan nilai Efficiency Index (EI) sebesar 1,01563 Dari nilai Relative Error (RE) memiliki selisih 1,56% yang dibandingkan antara model algoritma NEH dalam penelitian ini dengan model penjadwalan First Come First Service (FCFS). ABSTRACT At PT XYZ there are 19 types of production in a week which are completed with 3 shifts in 7 working days. Improper production planning made PT XYZ's production unable to meet production targets resulting in a lack of products requested by vendors, no scheduling revision efforts were made by PPIC with weekly MPP indicating that the production process was still running even though the number in the first week of the month there was a shortage of production which is so large that the production schedule that does not meet the target will be shifted to another schedule. thus causing production delays. The company's scheduled order of scheduling is Container GM5Z-3B PS, GM5Z-3B PS, Support FR Bumper Side RH, Support FR Bumper LH, T-Belt Cover Protector Base, T-Belt Cover Protector Cover, and Register Inst. Panel No.1 with a makespan value of 1545.76 hours. For this reason, PT XYZ is rescheduled in order to minimize the production completion time (makespan) of the production process. One method that can be used to overcome the problem of production delays which causes the production target is not to be achieved is using the Nawaz Enscore Ham method. The application of the Nawaz, Enscore, and Ham methods with the Shortest Processing Time (SPT) and Longest Processing Time (LPT) resulted in a decrease in mean flowtime and lateness of 1.56% and a reduction in makespan of 23.79 hours with LPT and SPT obtained the value of Efficiency Index (EI) is 1.01563. From the Relative Error (RE) value, there is a difference of 1.56% which is compared between the NEH algorithm model in this study and the First Come First Service (FCFS) scheduling model.

Cite

CITATION STYLE

APA

Syabani, S. F., & Setiafindari, W. (2022). Optimasi Penjadwalan Produksi Menggunakan Metode Nawaz Enscore Ham Pada PT XYZ. Jumantara Jurnal Manajemen Dan Teknologi Rekayasa, 1(1), 18. https://doi.org/10.28989/jumantara.v1i1.1288

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free