Optimized operation of an existing public building chilled station using TRNSYS

3Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

Abstract

Taking an existing public building as an example, the mathematical model of each equipment module of the chilled station and the TRNSYS custom module are established on the basis of the measured data. The mathematical model of "chilled station cooling capacity-equipment power" is proposed and established. The full-frequency control strategy based on device contribution rate is proposed. The TRNSYS simulation platform is used to simulate a public building chilled station in the cooling season. The result shows that the seasonal energy efficiency rate of the public building air-conditioning system is 2.15 times as high as the original after applying the new control strategy.

Cite

CITATION STYLE

APA

Liu, M., Sun, C., Zhang, B., Wang, J., Duan, Q., & Lv, L. (2018). Optimized operation of an existing public building chilled station using TRNSYS. Buildings, 8(7). https://doi.org/10.3390/buildings8070087

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free