Numerical Estimation of Shaft Stability and Surface Deformation Induced by Underground Mining Transferred from Open-Pit Mining in Jinfeng Gold Mine

5Citations
Citations of this article
15Readers
Mendeley users who have this article in their library.

Abstract

In this study, a three-dimensional finite difference numerical model of the Jinfeng Gold Mine, including surface topography, ore body, shafts, and main faults, was built to estimate the shaft stability and surface deformation induced by underground mining transferred from open-pit mining. Satellite monitoring data of surface displacement at several points was used to calibrate the numerical model. The sequence of excavation and filling in the simulation was determined according to the mining schemes with appropriate simplification. The distribution of large deformations in simulation is consistent with the cracking areas on the slopes and surface. Besides, shaft deformation in the simulation is small, which is consistent with the reality that there are no large deformations of shafts in the underground mining activities above 30 m level. After the completion of simulated underground mining, the deformations of shafts and surface are generally far less than the critical deformation. Hence, we concluded that the shafts and surface of the Jinfeng Gold Mine can remain stable in the underground mining stage. Overall, the method in the study provides references for the estimation of shaft stability and surface deformation in the underground mining stage of mine transfer from open pit.

Cite

CITATION STYLE

APA

Zhao, X., Yu, W., Zhao, Y., & Fu, S. (2023). Numerical Estimation of Shaft Stability and Surface Deformation Induced by Underground Mining Transferred from Open-Pit Mining in Jinfeng Gold Mine. Minerals, 13(2). https://doi.org/10.3390/min13020196

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free