Short-circuit analysis of pumped storage unit during back-to-back starting

8Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

Abstract

Back-to-back starting is a widely accepted starting method for pumped storage units. A back-to-back starting model of pumped storage units was built using the ElectroMagnetic Transients Program including DC (EMTDC) software package. The short-circuit fault during back-to-back starting was investigated for the first time. The starting process was simulated and compared with real data from a pumped storage power plant in northeast China. The rotor speed and the effect of resistance during fault period were also discussed. The results showed that the fault current has significant magnitude and low-frequency characteristic. Recommendations were provided to realise secure and reliable fault clearance during back-to-back starting based on the fault characteristics and real de-excitation test results of the pumped storage power plant.

Cite

CITATION STYLE

APA

Li, B., Duan, Z., & Wu, J. (2015). Short-circuit analysis of pumped storage unit during back-to-back starting. IET Renewable Power Generation, 9(2), 99–108. https://doi.org/10.1049/iet-rpg.2013.0419

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free