Value increase of jetty project based on system dynamics

4Citations
Citations of this article
29Readers
Mendeley users who have this article in their library.

Abstract

Waste or additional costs in infrastructure projects such as jetty projects are often caused by rework. Besides having an impact on costs, rework is also a very significant contributor to waste or add time which causes delays in the completion schedule of the project. A lot of research on rework has been carried out on both building and road construction projects, but there is no jetty construction project. This study aims to develop improvement scenarios to minimize the emergence of rework on pier infrastructure projects by modeling and simulating cost performance. The research variables were obtained based on the results of a literature study by asking for opinions from experts who are compatible in their scope. The initial model used the causal loop diagram form which was later developed into a Stock Flow Diagram, after which a repair simulation was carried out using the system dynamics method to determine the effect on cost performance. From the research results obtained 14 factors that affect the cost and time performance on the jetty project, the implementation of system dynamics can provide the optimum solution with the ability to reduce the percentage of the number of reworks by 24.12% for 12 months.

Cite

CITATION STYLE

APA

Prihantoro, A., & Husin, A. E. (2021). Value increase of jetty project based on system dynamics. Civil Engineering and Architecture, 9(3), 892–898. https://doi.org/10.13189/CEA.2021.090331

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free