Balancing workload and workforce capacity in lean management: Application to multi-model assembly lines

6Citations
Citations of this article
82Readers
Mendeley users who have this article in their library.

Abstract

While multi-model assembly lines are used by advanced lean companies because of their flexibility (different models of a product are produced in small lots and reach the customers in a short lead time), most of the extant literature on how to staff assembly lines focuses either on single-model lines or on mixed-model lines. The literature on multi-model lines is scarce and results given by current methods may be of limited applicability. In consequence, we develop a procedure to staff multi-model assembly lines while taking into account the principles of lean manufacturing. As a first approach, we replace the concepts of operation time and desired cycle time by their reciprocal magnitudes workload and capacity, and we define the dimensionless term of unit workload (load/capacity ratio) in order to avoid magnitudes related to time such as cycle time because, in practice, they might not be known. Next, we develop the necessary equations to apply this framework to a multi-model line. Finally, a piece of software in Python is developed, taking advantage of Google’s OR-Tools solver, to achieve an optimal multi-model line with a constant workforce and with each workstation performing the same tasks across all models. Several instances are tested to ensure the performance of this method.

Cite

CITATION STYLE

APA

Fortuny-Santos, J., Ruiz-De-arbulo-lópez, P., Cuatrecasas-Arbós, L., & Fortuny-Profitós, J. (2020). Balancing workload and workforce capacity in lean management: Application to multi-model assembly lines. Applied Sciences (Switzerland), 10(24), 1–21. https://doi.org/10.3390/app10248829

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free