Sistem Instalasi Pembangkit Pikohidro Untuk Keluaran Listrik Arus Searah 12 Volt

  • Andrik Sunyoto
  • Priya Surya Harijanto
  • Bakti Indra Kurniawan
N/ACitations
Citations of this article
41Readers
Mendeley users who have this article in their library.

Abstract

This research is focused to help peoples in remote areas who do not have electricity supply from PLN,but have sources of water flow in rivers. The main objective of this research is to create a picohydro hydroelectricpower plant with a floating turbine to utilize the kinetic energy of river water flow in areas that have not beensupplied with PLN electricity. The flow of water in the river will rotate the turbine, which in the end the rotationalpower is channeled through a pulley and belt system, which eventually turns an alternator. The alternator used isa three-phase AC alternator. Then the AC current will be rectified by the bridge rectifier to then be used to chargethe battery and go to the load. In addition, in this study, the ability of the pico-hydro system to supply electricalenergy will be tested to be able to run 12 V DC electrical loads and charge 12 V batteries.

Cite

CITATION STYLE

APA

Andrik Sunyoto, Priya Surya Harijanto, & Bakti Indra Kurniawan. (2023). Sistem Instalasi Pembangkit Pikohidro Untuk Keluaran Listrik Arus Searah 12 Volt. Elposys: Jurnal Sistem Kelistrikan, 9(3), 99–107. https://doi.org/10.33795/elposys.v9i3.642

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free