Scheduling Model for Rehabilitation of Distribution Networks Using MINLP

  • Salman A
  • Moselhi O
  • Zayed T
8Citations
Citations of this article
28Readers
Mendeley users who have this article in their library.
Get full text

Abstract

Scheduling of the rehabilitation activities of water main networks depends mainly on available budget and planning time. Other factors such as network reliability, criticality, location, contract size, and rehabilitation method(s) affect the optimization of the scheduling process. This paper presents a method for optimized scheduling of rehabilitation work for water distribution networks. The method utilizes unsupervised neural networks (UNNs) and mixed-integer nonlinear programming (MINLP) and performs the scheduling in two stages. In the first stage, UNNs are used to cluster water mains into groups according to locations and rehabilitation methods of water mains. In the second stage, MINLP is used to determine the number of rehabilitation contract packages and the generation of optimized scheduling of these packages considering network reliability, criticality, contract size, and planning time. In order to demonstrate the essential features of the developed method, a case study was analyzed and the results obtained are discussed; highlighting their utilization in practice. DOI: 10.1061/(ASCE)CO.1943-7862.0000578. (C) 2013 American Society of Civil Engineers.

Cite

CITATION STYLE

APA

Salman, A., Moselhi, O., & Zayed, T. (2013). Scheduling Model for Rehabilitation of Distribution Networks Using MINLP. Journal of Construction Engineering and Management, 139(5), 498–509. https://doi.org/10.1061/(asce)co.1943-7862.0000578

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free