Optimal outage management model considering emergency demand response programs for a smart distribution system

21Citations
Citations of this article
14Readers
Mendeley users who have this article in their library.

Abstract

In this paper, a novel smart outage management system considering Emergency Demand Response Programs (EDRPs) and Distributed Generations (DGs) denoted as SOMSEDRPs is proposed. DGs The EDRPs are provided to decrease the cost of load shading in a time of emergency. The objective function of the problem is proposed to minimize the load shading cost, the DG dispatch cost, the demand response cost and the repair dispatch time for crews. The SOMSDERPs solves an DGs optimization problem that is formulated as Mixed Integer Linear Programming (MILP) taking into account the grid topology constraints, EDRP constraints, DG constraints and crew constraints. The MILP formulation was demonstrated in the GAMS software and solved with the CPLEX solver. The proposed method was tested on the IEEE 34 bus test system as well as an actual Iranian 66 bus power distribution feeder. The results show that the EDRPs and DGs can be effective in decreasing the outage cost and increasing the served load of the distribution power system in a crisis time.

Cite

CITATION STYLE

APA

Dorahaki, S., Dashti, R., & Shaker, H. R. (2020). Optimal outage management model considering emergency demand response programs for a smart distribution system. Applied Sciences (Switzerland), 10(21), 1–19. https://doi.org/10.3390/app10217406

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free