Analisis Performansi Turbin dan Generator di PLTP Lahendong Unit 1 Tomohon

  • Musa L
  • Rahman A
  • Gapshel I
  • et al.
N/ACitations
Citations of this article
28Readers
Mendeley users who have this article in their library.

Abstract

Lahendong Geothermal power plant is one of the Geothermal power plants in Indonesia which has four units and it be able to generate 4 × 20 MW of electrical energy by utilizing geothermal energy in the form of steam that supplied from wells created by Pertamina. The aim of this study is to determine the performance of the turbine and generator unit 1 which has been operated since 2001 by using thermodynamic analysis method calculating the steam quality and turbine work. Afterwards, turbine efficiency, turbine power and generator power were obtained. The average quality of geothermal steam at Lahendong in 2001 and 2015 were 0.8002 and 0.8065. Turbine’s performance decreased in 2001 (664.021 kJ / kg) until 2015 (640.799 kJ / kg), with the highest generator rotation tolerance of 0.9%.

Cite

CITATION STYLE

APA

Musa, L. O., Rahman, A., Gapshel, I., & Sombokanan, T. (2019). Analisis Performansi Turbin dan Generator di PLTP Lahendong Unit 1 Tomohon. Jurnal Teknik Mesin Sinergi, 17(1), 25–36. https://doi.org/10.31963/sinergi.v17i1.1589

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free