Scheduling and control of parts in FMS industry

2Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

This paper introduces scheduling of parts in Flexible Manufacturing System (FMS) environment by means of discrete-event simulation method. Modeling of FMS layout with 3 distinct part type, route and interval for each part is developed using Arena simulation. The ranking criterion is considered only for First-in-first-out (FIFO). Automatic Guided Vehicles (AGV) is used as a Material Handling System (MTH). In this paper a case study has been presented for effective utilization of machines and AGV in given FMS. Based on processing time for variety of parts according to their route priority the jobs are scheduled. The scheduling of the considered layout are evaluated and compared to 6 output measures which are avg. work in process (WIP), avg. queue time, avg. number of parts waiting, resource seized, machine instantaneous utilization and scheduled utilization for different replication length. The simulation outcomes are discussed in detail and conclusion has been drawn for various mentioned output measures.

Cite

CITATION STYLE

APA

Yedukondalu, G., Thakare, M., Anvesh, V., Hokesh Reddy, R., & Cheetri, A. (2018). Scheduling and control of parts in FMS industry. International Journal of Engineering and Technology(UAE), 7, 214–219. https://doi.org/10.14419/ijet.v7i2.24.12034

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free