THE TOYOTA KATA METHODOLOGY FOR MANAGING THE MATURITY LEVEL OF LAST PLANNER® SYSTEM

6Citations
Citations of this article
36Readers
Mendeley users who have this article in their library.

Abstract

The implementation of the Last Planner® System (LPS) generates reliable production flows in construction projects and improves the competitiveness of companies that adopt the system. Research shows a greater number of implementations in construction companies and also recognizes that the effectiveness of LPS in projects is not achieved due to partial, short-term implementations, and without continuous feedback. This paper describes a proposal for managing the LPS maturity level with the objective of implementing all the components of the methodology and developing the project organization. It proposes the use of a method based on the LPS maturity model proposed by the Lean Construction Institute and the Toyota Kata methodology, described by Myke Rother, to help organizations achieve improvement actions. The proposed methodology was evaluated in a case study and the results were compared based on literature regarding the level of adoption of the organizations implementing the LPS components. The results and indicators obtained were compared with studies on the implementation of LPS in projects.

Cite

CITATION STYLE

APA

Perez-Apaza, F., Ramírez-Valenzuela, A., & Perez-Apaza, J. D. (2021). THE TOYOTA KATA METHODOLOGY FOR MANAGING THE MATURITY LEVEL OF LAST PLANNER® SYSTEM. In IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges (pp. 514–523). Department of Engineering, Civil Engineering Division, Pontificia Universidad Catolica del Peru. https://doi.org/10.24928/2021/0194

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free