Abstract
In this paper, we investigate whether the interconnection of power grids with 100% renewable energy generation can bring greater economic benefits now that the technology exists for high power, long distance Ultra High Voltage Direct Current transmission. Based on multi-year historical weather data and demand series, this study compares eight interconnection schemes for three regional grids in Europe, North-East Asia, and North America where there is around 8-hour time difference between any of the two regions. Sensitivity analyses are presented with respect to infrastructure capital cost and different weather year which show that interconnection yields a reduction of approximately 18% in the total annual system cost. The results in this paper also indicate that the regional levelized cost of electricity (LCOE) drops by 31%, 10%, and 10% for Europe, North-East Asia and North America, respectively. It is concluded that there is a strong incentive through both annual cost saving and regional LCOE drop in favour of full long-distance interconnections between the three regions in the context of the international drive towards a net-zero strategy.
Author supplied keywords
Cite
CITATION STYLE
Wu, C., Zhang, X. P., & Sterling, M. J. H. (2021). Economic analysis of power grid interconnections among Europe, North-East Asia, and North America with 100% renewable energy generation. IEEE Open Access Journal of Power and Energy, 8, 268–280. https://doi.org/10.1109/OAJPE.2021.3085776
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.