TRUST AND CONTROL IN THE CONTEXT OF INTEGRATED PROJECT DELIVERY

1Citations
Citations of this article
9Readers
Mendeley users who have this article in their library.

Abstract

Project delivery models with a high level of integration of the involved partners like "Project Alliancing" (e.g. in Australia and Finland) and "Integrated Project Delivery" (IPD) (e.g. in the US and Canada) have been used successfully for many years. These models differ from traditional models particularly by integrating key project participants at an early stage and offer incentive models based on the success of the project. In this article the term “Integrated Project Delivery” (IPD) is also used as a generic term for project delivery models with a high level of integration. The successful implementation of these models requires a high degree of trust between the partners. At the same time a certain level of control can be beneficial or even required. The following article examines the question which elements in an IPD project influence the level of trust between the partners and to what extent control is required in turn. Therefore elements of IPD that require trust are identified and their configuration depending on the level of trust is analysed.

Cite

CITATION STYLE

APA

Frantz, L., Hanau, A., Budau, M. R. D., Haghsheno, S., Väth, C., & Schmidt, J. S. (2021). TRUST AND CONTROL IN THE CONTEXT OF INTEGRATED PROJECT DELIVERY. In IGLC 2021 - 29th Annual Conference of the International Group for Lean Construction - Lean Construction in Crisis Times: Responding to the Post-Pandemic AEC Industry Challenges (pp. 464–473). Department of Engineering, Civil Engineering Division, Pontificia Universidad Catolica del Peru. https://doi.org/10.24928/2021/0158

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free