Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations

13Citations
Citations of this article
22Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

In a multi-manned assembly line, tasks of the same workpiece can be executed simultaneously by different workers working in the same station. This line has significant advantages over a simple assembly line such as shorter line length, less work-in-process, smaller installation space, and less product flow time. In many realistic line balancing situations, there are usually more than one objective conflicting with each other. This paper presents a preemptive goal programming model and some heuristic methods based on variable neighborhood search approach for multi-objective assembly line balancing problems with multi-manned stations. Three different objectives are considered, minimizing the total number of multi-manned stations as the primary objective, minimizing the total number of workers as the secondary objective, and smoothing the number of workers at stations as the tertiary objective. A set of test instances taken from the literature is solved to compare the performance of all methods, and results are presented.

Cite

CITATION STYLE

APA

Kellegöz, T. (2016). Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations. Mathematical Problems in Engineering, 2016. https://doi.org/10.1155/2016/9315024

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free