Investigating the effect of curing and thermal equilibrium time on rutting potential of hot mix asphalt

2Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

Rutting is a common damage of flexible pavements, reducing the service life of asphalt pavement. Due to laboratory limitations, asphalt mixtures are subjected to different curing times (since construction until placement in the test chamber) and thermal equilibrium times (since placement in the test chamber until the beginning of the test) before rutting tests. Neglecting these factors can lead to errors in the laboratory results. Therefore, the present study attempted to investigate the effect of curing times of 1, 2, and 3 days at 25ºC and thermal equilibrium times of 2, 4, and 6 hours on the rutting potential of different hot-mix asphalt (HMA) mixtures. Results of rutting tests showed that the rutting potential of asphalt mixtures decreases by increasing the curing time, while the permanent deformation at the end of loading cycles and rutting potential increase by increasing the thermal equilibrium time. Additionally, the results of statistical analyses revealed that curing time and thermal equilibrium time change the rutting potential of asphalt mixtures.

Cite

CITATION STYLE

APA

Jajin, M. G., Esmaeili, N., & Hamedi, G. H. (2021). Investigating the effect of curing and thermal equilibrium time on rutting potential of hot mix asphalt. Periodica Polytechnica Civil Engineering, 65(3), 691–701. https://doi.org/10.3311/PPci.16952

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free