TBM risk management system considering predicted ground condition ahead of tunnel face: Methodology development and application

1Citations
Citations of this article
8Readers
Mendeley users who have this article in their library.

Abstract

When using a Tunnel Boring Machine (TBM) during tunneling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These reduce the stability of tunnels, and can result in considerable economic losses. This paper analyzes the potential risk events that may occur due to risky ground conditions. A resistivity survey is utilized to predict the risky ground conditions ahead of the tunnel face during construction. The potential risk events are evaluated considering both the occurrence probability and the impact. A TBM risk management system that can suggest proper solution methods for potential risk events is also developed. Multi-Criterion Decision Making (MCDM) is utilized to determine the optimal solution method to handle risk events. Lastly, an actual construction site, at which a risk event occurred during tunnel construction, is analyzed utilizing the Earth Pressure Balance (EPB) Shield TBM, to verify the efficacy of the proposed system.

Cite

CITATION STYLE

APA

Chung, H. Y., Park, J., Lee, S. W., Choi, H., & Lee, I. M. (2016). TBM risk management system considering predicted ground condition ahead of tunnel face: Methodology development and application. In ITA-AITES World Tunnel Congress 2016, WTC 2016 (Vol. 3, pp. 2356–2365). Society for Mining, Metallurgy and Exploration. https://doi.org/10.9711/ktaj.2016.18.1.001

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free