Standalone Photovoltaic System Cost Optimization for Matantimali Village Central Sulawesi

5Citations
Citations of this article
15Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Electricity is very limited in Matantimali village where it is located on the slopes of Gawalise, Marawola District, Sigi Regency, Central Sulawesi Province. In this village, the state electricity company (PLN) can only provide electricity during the day from 06:00 to 18:00. During night, the diesel generator becomes the main energy source for the village providing electrical energy from 18:00 until 06:00. However, the use of diesel generators contradicts with the government commitment to generate environmental eco-friendly power generation. This study aims to analyse and to optimize the price of off-grid solar systems which will be implemented in the village of Matantimali as a potential replacement of the existing diesel based electric energy. We find in this study that 11 PV units with a total power of 3,686 Wp, two 2400 W powered inverter, and a 16-unit battery cover are the required specification for optimal power of 1300 VA load. The Off-grid solar panel installation system creates annual cost savings of IDR 3,543,397 compared to the use of conventional electricity using diesel generators and PLN.

Cite

CITATION STYLE

APA

Aprillia, B. S., Made Hendry Keswara, I., Raharjo, J., Ramdhani, M., Adam, K. B., & Suhartono, E. (2020). Standalone Photovoltaic System Cost Optimization for Matantimali Village Central Sulawesi. In IOP Conference Series: Materials Science and Engineering (Vol. 982). IOP Publishing Ltd. https://doi.org/10.1088/1757-899X/982/1/012023

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free