Abstract
Institute of Modern Physics (IMP), Chinese Academy of Sciences, is the first domestic institute that widely applied solid-state power amplifier (SSPA) to linear accelerator project from the C-ADS project started since 2011. Until now, the same design has already been considered for two large-scale scientific facilities in Guangdong Province of southeast China, China initiative Accelerator Driven System and High Intensity Heavy-ion Accelerator Facility. In a recent decade of accelerator project construction, a large amount of valuable experience in solid-state power source design build and operation was accumulated with the operation and upgrade of several projects. Furthermore, following the successful development of the IMP SSPA, a new “standardization” design concept was put forward after many modifications and improvements, which means all designs meet the stringent system requirements: high performance, low cost, high scalability, high reliability, and ease of maintenance need. The new design and technology can be developed for this accelerator solution, such as the high-performance power amplifier, “hot swap” technology, and special combiners, which are all new methods for long-term stable operation and maintenance on-site, especially the processing failure without rf power interrupting. This paper will detail the development of “standardization” design and its technical characteristics.
Cite
CITATION STYLE
He, Y., Shi, L., Jin, K., Sun, L., Jiang, G., Qiu, F., … Wang, Z. (2023). Development of solid-state amplifier for accelerator project based on the concept of standardization. Physical Review Accelerators and Beams, 26(11). https://doi.org/10.1103/PhysRevAccelBeams.26.112002
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.