Design and top-down construction at the Nanjing Youth Olympic Center, China

3Citations
Citations of this article
12Readers
Mendeley users who have this article in their library.

Abstract

This paper describes the design and top-down basement construction of Nanjing Youth Olympic Center in Nanjing, China. The building’s twin towers are 315 m high and are among the tallest to have had their basements constructed top-down. Designed and built for the Nanjing 2014 Youth Olympic Games, the structure was completed in just 20 months. Top-down construction was selected by the design engineer, along with various new techniques and developments of existing methods, to save time and improve safety. This paper describes the site conditions and structural design process, followed by the sequence of top-down basement construction. The design details of the diaphragm wall, foundations, columns, basement excavation and vertical load transfer are also presented. The paper aims to provide a reference for those using top-down construction on tall buildings.

Cite

CITATION STYLE

APA

Ren, Q., Zhao, Q., Liu, W., Yang, S., Li, S., Yang, J., & Peng, F. (2016). Design and top-down construction at the Nanjing Youth Olympic Center, China. Proceedings of the Institution of Civil Engineers: Civil Engineering, 169(2), 65–70. https://doi.org/10.1680/jcien.15.00045

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free