Optimasi Site Layout Batching Plant (Studi Kasus Batching Plant PT. Adhimix Precast Daerah Serpong)

  • Ghifary R
  • Subagyo G
  • Arbaningrum R
N/ACitations
Citations of this article
12Readers
Mendeley users who have this article in their library.

Abstract

Site layout optimization aims to get the most optimal form of site layout. In this study, the site layout will be optimized using the multi objective function method by minimizing the Traveling Distance (TD) and Safety Index (SI) values. The calculation of the optimum site layout is done by making several alternative transfers of facilities. Based on the calculation results, the minimum TD result is alternative 0 of 4014,261 meters, and the minimum SI result is alternative 4 of 287,034. Alternative 0 cannot be compared because alternative 0 is the basic layout. Then in Alternative 4, there is an increase in TD of 80.98% and a decrease in SI of 12.66% from alternative 0. Therefore, to determine the most optimal site layout, the method is to use the calculation of the percentage value of traveling distance and safety index. Based on the results of interviews with PT. Adhimix Precast Indonesia Serpong area, the percentage rate given for traveling distance is 40% and the safety index is 60%. Based on the calculation of the percentage of TD and SI from all alternative layouts, it was found that the basic layout is the most optimal layout with the minimum value of 1802,897.

Cite

CITATION STYLE

APA

Ghifary, R., Subagyo, G. W., & Arbaningrum, R. (2021). Optimasi Site Layout Batching Plant (Studi Kasus Batching Plant PT. Adhimix Precast Daerah Serpong). Jurnal Proyek Teknik Sipil, 4(2), 57–63. https://doi.org/10.14710/potensi.2021.11851

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free