Study on the Technical Evaluation of Acceptance of Water and Soil Conservation Facilities in Hydropower Projects - - Taking Yinpan Hydropower Station as an Example

0Citations
Citations of this article
5Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

Since soil and water conservation facilities through the purchase of services by the government, the working procedures had changed. This paper studied the evaluation work program, combination with Yinpan hydropower station, which divided into personnel composition, site survey, data verification, communication and reporting. The legal procedures for the implementation of soil and water conservation were checked to confirm the scope of responsibility for the prevention and control of soil erosion. Spoil yard and stone pit were surveyed and analysed one by one to confirm the soil and water conservation measures, the amount of soil and water conservation measures, the quality evaluation and the effect of soil erosion control. The construction and operation management of soil and water conservation were evaluated in the end. Through soil and water conservation facilities acceptance evaluation of Yinpan Hydropower Station, experience was summarized, which could be used as reference for the acceptance of soil and water conservation facilities in hydropower project in the future.

Cite

CITATION STYLE

APA

Chen, L., Wang, Z., Li, J., Zhang, C., & Yang, H. (2020). Study on the Technical Evaluation of Acceptance of Water and Soil Conservation Facilities in Hydropower Projects - - Taking Yinpan Hydropower Station as an Example. In Journal of Physics: Conference Series (Vol. 1624). IOP Publishing Ltd. https://doi.org/10.1088/1742-6596/1624/4/042067

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free