Application of the equipment replacement dynamic programming model in conveyor belt replacement: Case study of a gold mining company

7Citations
Citations of this article
10Readers
Mendeley users who have this article in their library.

Abstract

As assets age, they generally deteriorate, resulting in rising operating and maintenance costs and decreasing salvage values. In this paper a comprehensive Dynamic Programming-based optimisation solution methodology is used to solve the equipment replacement optimisation problem on the replacement of conveyor belts at a Gold Mining company in Zimbabwe. Given a mining setup with one and two-year old conveyor belts the ultimate objective is to keep or replace the conveyor belt such that the overall cost of material handling is minimised within a five-year period. The findings reveal that this mining system should replace conveyor belts yearly. It is concluded that, an equipment replacement policy for conveyor belts is a necessity in a mining system so as to achieve an optimal contribution to the economic value that a mining system may accrue within a period of time.

Cite

CITATION STYLE

APA

Zvipore, D. C., Nyamugure, P., Maposa, D., & Lesaoana, M. (2015). Application of the equipment replacement dynamic programming model in conveyor belt replacement: Case study of a gold mining company. Mediterranean Journal of Social Sciences, 6(2S1), 605–612. https://doi.org/10.5901/mjss.2015.v6n2s1p605

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free