Abstract
Considering multiple possible scenarios in the process of project construction, the prefabricated project scheduling problem is studied in combination with the theory of multi-mode resource-constrained project scheduling problem. Multi-objective multi-mode resource-constrained project scheduling model with time/robustness trad-offs was constructed. Next, the adjusted non-dominated genetic algorithm (NSGA-II) was designed to solve the model. Finally, the proposed model and algorithm were implicated to a real project, in order that research achievement can guide managers to make decisions and invest resources scientifically and reasonably.
Cite
CITATION STYLE
Wang, R., & Lian, J. (2020). Research on Construction Schedule Optimization of Assembly Building Based on NSGA-II. In E3S Web of Conferences (Vol. 165). EDP Sciences. https://doi.org/10.1051/e3sconf/202016506055