Joint stochastic short-term production scheduling and fleet management optimization for mining complexes

66Citations
Citations of this article
112Readers
Mendeley users who have this article in their library.

This article is free to access.

Abstract

This article presents a novel stochastic optimization model that simultaneously optimizes the short-term extraction sequence, shovel relocation, scheduling of a heterogeneous hauling fleet, and downstream allocation of extracted materials in open-pit mining complexes. The proposed stochastic optimization formulation considers geological uncertainty in addition to uncertainty related to equipment performances and truck cycle times. The method is applied at a real-world mining complex, stressing the benefits of optimizing the short-term production schedule and fleet management simultaneously. Compared to a conventional two-step approach, where the production schedule is optimized first before optimizing the allocation of the mining fleet, the costs generated by shovel movements are reduced by 56% and lost production due to shovel relocation is cut by 54%. Furthermore, the required number of trucks shows a more balanced profile, reducing total truck operational costs by 3.1% over an annual planning horizon, as well as the required haulage capacity in the most haulage-intense periods by 25%. A metaheuristic solution method is utilized to solve the large optimization problem in a reasonable timespan.

Cite

CITATION STYLE

APA

Both, C., & Dimitrakopoulos, R. (2020). Joint stochastic short-term production scheduling and fleet management optimization for mining complexes. Optimization and Engineering, 21(4), 1717–1743. https://doi.org/10.1007/s11081-020-09495-x

Register to see more suggestions

Mendeley helps you to discover research relevant for your work.

Already have an account?

Save time finding and organizing research with Mendeley

Sign up for free