Abstract
This research examines the implementation of grid-tied solar inverters in Lahore’s energy infrastructure, considering the city’s growing energy demands. Utilizing MATLAB/Simulink for modeling solar photovoltaic systems in Lahore’s arid climate, our study focuses on a house in Askari X housing society, Lahore, Pakistan, with a 5.1 kW load. The results demonstrate the expected system variation of a Grid-Tied PV System during grid disruptions, and the model’s consistent performance across varying irradiance conditions suggests potential economic advantages through net metering. These findings offer practical insights into the economic feasibility and dependability of grid-tied solar inverters in Lahore, highlighting their potential to contribute to the city’s energy needs.
Cite
CITATION STYLE
Akhtar, M. U., & Iqbal, M. T. (2024). Modeling and Simulation of Grid-Tied Three-Phase PV System in Lahore, Pakistan. European Journal of Electrical Engineering and Computer Science, 8(1), 23–32. https://doi.org/10.24018/ejece.2024.8.1.603
Register to see more suggestions
Mendeley helps you to discover research relevant for your work.